At the FatFace Foundation, we’re proud to support projects that protect and restore the natural world for generations to come. Through our partnership with the Peak District National Park Foundation, we’re providing £5,000 a year for three years towards vital moorland restoration, helping to bring damaged peatland back to life and create a healthier, more resilient landscape.

And after the first season of work, there’s already plenty to celebrate!

Our partnership is supporting restoration around Birchinlee in the Upper Derwent Valley. The blanket bog here took around 5,000 years to form, but over the past two centuries it has been badly degraded by drainage, overgrazing, historic atmospheric pollution and other pressures.

At first glance, supporting a peatland project might seem a long way from protecting our oceans. In reality, our natural environments are deeply connected.

Healthy moorland can act as a natural water filter and help slow floodwater. For the FatFace Foundation, that connection between healthier peatlands, rivers and ultimately our seas is an important part of why we chose to support this project

 

Moorland restoration takes place during the winter season, from October to March. Spring and summer are avoided because of ground-nesting birds, while colder conditions help firm up the ground so machinery can operate without damaging the fragile peat beneath.

Despite a shortened working season and an exceptionally wet and foggy winter, the team has achieved an enormous amount:

  • 1,690,000 sqm of moorland restored, an area larger than Hyde Park and equivalent to around 237 football pitches.
  • 212,500kg of heather brash spread across bare ground, providing seeds and shelter to help vegetation become established.
  • 3,677 bags of lime, seed and fertiliser applied, helping create better conditions for moorland plants.
  • 2,361 dams built to rewet the moor, slowing the flow of water and helping raise the water table.
  • And an incredible 451,000 sphagnum moss plugs planted by hand.

Sphagnum moss might be small, but it plays a starring role in restoring a healthy blanket bog. It holds water like a sponge and creates the conditions that allow peat to form. The original restoration plans included planting sphagnum at a density of around 2,500 plug plants per hectare, so doing this work by hand is quite an undertaking.

The landscape is already showing encouraging signs. The team has spotted golden plover and curlew nesting on and around the bog, as well as signs of merlins. For us, those sightings are a wonderful reminder of what this work is ultimately about: giving nature the space and conditions it needs to recover.

Large-scale restoration doesn’t happen overnight. It takes expertise, funding, collaboration and plenty of hard work. That’s why we’re so proud to be supporting the Peak District National Park Foundation and this project that is making a visible difference to this extraordinary landscape. From hundreds of thousands of tiny sphagnum plants to more than a million square metres of restored moorland, every part of the project contributes towards something much bigger: healthier habitats, healthier waterways and a landscape that can thrive for generations to come.